xAI · Foundation models
Construction Scheduler - Memphis
- Southaven (On‑site), +1 more: Memphis
Still open on xAI's site · checked just now
- Experience
- 4+ years
- Posted
What you'll do
As written by xAI · Read the original
RESPONSIBILITIES
- Build baseline CPM schedules from drawings, specs, estimates, bid packages, and construction sequences (WBS, activity coding, logic, calendars, and constraints used sparingly and correctly)
- Maintain the live schedule: collect progress from superintendents, project managers, and trades; update percent complete, remaining duration, and logic; publish a clean current-period update on a set cadence (typically weekly look-aheads and monthly official updates)
- Own the critical path. Identify near-critical work, float erosion, and out-of-sequence progress. Tell the team why the end date moved, not just that it did
- Produce three-week (or similar) look-aheads that match the master schedule and what the field can actually crew
- Analyze schedule impact of RFIs, change orders, design late-outs, access constraints, long-lead procurement, weather, and labor shortages. Prepare time-impact analyses (TIA) and what-if, recovery, and acceleration scenarios
- Coordinate with project managers, superintendents, estimators, procurement, design, owners/CMs, and subcontractors so the schedule reflects committed dates, not wishful ones
- Resource-load and, where required, cost-load the schedule. Flag crew stacking, craft shortages, and unrealistic production rates
- Prepare narratives, variance reports, S-curves, histograms, and executive summaries for internal reviews and owner/CM submittals
- Support claims and delay documentation with contemporaneous records (as-planned vs. as-built, fragnets, delay categorization) when needed
- Enforce schedule standards: naming, coding, update process, backup, and version control so the file remains auditable
- Facilitate or support pull-planning / Last Planner sessions and convert those commitments into logic in the CPM model
- Visit the site regularly. A scheduler who never walks the job will be wrong
Requirements
BASIC QUALIFICATIONS
- 4+ years of construction scheduling on active projects (GC, CM, owner’s project controls, or specialty contractor)
- 4+ years of experience using Smartsheet, MS Project, or other project management tool
- 4+ years of experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)
PREFERRED SKILLS AND EXPERIENCE
- Comfortability with multiple calendars, relationship types, filters, layouts, global vs. project data, and schedule quality checks (open ends, negative float, SS/FF overuse, constraints)
- Bachelor’s in construction management, civil engineering, or a related field; OR equivalent field experience
- PSP (AACE), PMI-SP, PMP, CCM, or similar credential
- Experience with owner/CM specification-driven schedules (e.g., DCMA 14-point, USACE, or similar quality metrics)
- Forensic delay analysis, time-impact analysis, and claims support
- Cost/resource loading, earned value, and integration with cost systems
- Last Planner / pull planning; BIM 4D (Navisworks, Synchro) is a plus
- Additional tools as applicable: Power BI, Smartsheet, Procore, Autodesk Construction Cloud
ADDITIONAL REQUIREMENTS
- Willing to work extended hours as needed, including the current 6-day / 12-hour construction cadence
- Must be comfortable working in a fully onsite environment
SpaceXSI is an equal opportunity employer. For details on data processing, view our Recruitment Privacy Notice.
Skills
Working languages
English
Company
Last checked . The details above were extracted automatically; the employer's original posting is the authority.